It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project. 16010-1 . Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Maintenance agreements and similar continuing commitments. Provide an index chart for identification. Remove and replace Work not conforming to requirements of the Contract Documents. Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. 0000000596 00000 n **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? Remove conduit, hangers, supports, etc. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. Notify UMB in advance of scheduled inspections. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. ph p he h;F B* HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. COMAR (Code of Maryland Regulations). hb```,lleaX 0p7Q;0"cuLfJ 'f`^a]Qp@q 2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p 0000001525 00000 n 1.1 GENERAL CONDITIONS . Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. F. Supply Voltage ADA (American with Disabilities Act). Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope. PDF SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL - DeLapp SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description This Division includes the complete installation of power, control, instrumentation, wiring, lighting, and other electrical systems as specified in the Sections of Division 16. Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. SECTION 16010 . 264 15 DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. ph p hf h8 B* shall meet the requirements of the associated spec section(s). Section 16050 - Basic Electrical Materials and Methods . 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream hbbd```b`` Local or State license where required. SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . endstream endobj startxref NJ j5)'~# 4"{:k[k%nK0Er`@ Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. Shut down. Div. All submitted materials and equipment are subject to approval by the A/E and UMB. Power Distribution System. endobj 0000001182 00000 n VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. Remove all electrical clippings, wiring, nuts, bolts, etc. 0 PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z 611.0 Acceptance Test 612.0 Time of instruction shall be designated by the Owner. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. Also turn off Underlines.) 278 0 obj<>stream 5. G.|,b43f`0pXaE"zs aN Provide at least forty (40) hours straight time instruction to the operating personnel. xref Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. vol. At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. Available, on site, at all times during construction. Ends shall be capped with push plugs for future use. %PDF-1.6 % startxref _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! HdSMo0W(jId]6t=K"N[ #$_^K.!Ze9dV0rOV\J`F@K6c,td6_b!JUjke3UK^mSw\,}GAqsv@qhnb/mWRj+'jXo4Zg|%>S9|WVTRn'p#X18G\R%0L|["l\pzJxFqLxX#4\;c?(=;7HZ\Y6+I(1LDe[9mAMwd]U'Gh-cEIV\# ,4cJ%P)iqOD%1x1Z=. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . l2f71S-K#C@EM{Wtq trailer You also have the option to opt-out of these cookies. General Provisions | PDF | Electrical Wiring | Specification - Scribd 3 electrical and mechanical specifications, specifications for electrical unit substation . to a point below the finished floors or behind finished walls and cap. PDF DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL - Hawaii Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. Calculations for battery capacity and voltage drop. Provide installation in accordance with recognized trade organizations and standards: NEMA. 2.0 GENERAL DESCRIPTION: A. PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. CUTTING AND PATCHING General: Perform cutting and patching in accordance with Division 1 Section "Cutting and Patching." Place grout to completely fill equipment bases. Do not include this data in the Product Submittals. hbbd``b` $V Fg $s6e"A?a)L:= S ` + State of Maryland Fire Prevention Code. . 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. 0000003026 00000 n The following list shall be used as a guide only: Equipment such as transformers, generators, etc. Samples shall indicate applicable specification section number and item numbers within that section. @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. 16010 - 1 . SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. Obtain all necessary permits from 2. endstream endobj 11265 0 obj <>stream +"Y3`pHw]|Gq{5ST>#;@ @FF Motor manufacturer, motor type or model . General Provisions | PDF | Specification (Technical Standard) - Scribd Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. Section 16010 - General Electrical Requirements . CA-1817 / PN15160009 16010 - 1 DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL PROVISIONS PART 1 - GENERAL 1.01 INTENT OF SPECIFICATIONS AND DRAWINGS A. COORDINATION DRAWINGS General: When required participate in the preparation of the coordinated drawing effort for the project. Provide connectors with insulating bushings. SEQUENCING AND SCHEDULING Coordinate electrical equipment installation with other building components. Install equipment and materials in existing structures. This website or its third-party tools use cookies. Electrical Specifications | PDF | Electrical Wiring | Pipe (Fluid For equipment requiring seasonal operation, perform instructions for other seasons at the same time. L1)Tj4d v"1s%H"r$-j` ,}# Record documents. 1.1 GENERAL. 0000000016 00000 n PDF Div. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 INDEX - Winnipeg EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. (Engineer shall edit specifications and blue text in header to meet project requirements. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. Part Number 16010, Narrow Section Ball Bearings (16000, 16100) Install all components and equipment per manufacturers written instructions. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. Div. If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. Both riser and floor plan shall indicate address of devices where applicable. In addition to the requirements specified in Division 01, indicate the following installed conditions: Conduit and wire runs between the points Equipment locations (exposed and concealed), dimensioned from prominent building lines. endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream Economy and efficiency adjustments. ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Identification systems. 0000003103 00000 n 3 0 obj General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. B. are not concealed by new work. l!j=MO_Q7 ze|M|+LUQYm9J]o[_UfO^U|o5_`e::,k?3R j{`11rW{b@{Lw?mcrfc~b l vrOl-~jbG6+)JTz3{ {{.j~@+rin2A:SG!=,wB`q!NU mYfXR{Y Variable frequency drives. ph p hf h8 >*B* Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load Before initiating any work, a job specific work plan must be developed by the contractor. This Section of the Specifications and its accompanying Drawings are made SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190 Access shall be as required by code and/or as determined by the Architect and Engineer. Comply with the following requirements: Coordinate electrical systems, equipment, and materials installation with other building components. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P {s@_yj1' 3{J1tB;=6bcC. PDF DIVISION 16 - ELECTRICAL SECTON 16010 - GENERAL PROVISIONS Table of The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. BASIC ELECTRICAL REQUIREMENTS . 11261 0 obj <> endobj Size and location of all electrical panels. Necessary cookies are absolutely essential for the website to function properly. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . endstream endobj 2010 0 obj <>stream endstream endobj 575 0 obj <>stream An electrical foreman, superintendent or other supervisor familiar with the project shall be in attendance for all scheduled electrical inspections. uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe 2020 0 obj <>stream xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. Distribution panels. END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. 16010 - Deep groove ball bearings | SKF DTW Works Master Specification Section 16061 - Studylib 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. Remove conduit, hangers, supports, etc. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 afdb`dg4baTfX:r-X5)H! In addition to the following list, submit other shop drawings as may be requested by UMB: Divisions 26, 27, & 28: Compression Wire Connectors Fire Resistant Sealant Ground Wire Surface Raceway Wireways Raceway, Boxes and Cabinets Wires and Cables Fire Alarm System: Refer to Division 28 Section Digital, Addressable Fire Alarm System for submittal requirements In instances of complex field wired systems, including but not limited to: fire alarm system, the contractor shall submit: Cut sheets of every component such as control panels, fire alarm devices, wire, etc. INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. 11282 0 obj <>stream SECTION 16010 . B. Section 16151 - Vertical Hollowshaft Electric Motors . Listing and Labeling: Provide products specified in this Section that are listed and labeled. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. hbbd``b`q @`W@qD%XAWH12N@ M [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. Mix grout according to manufacturer's printed instructions. hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I 0 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Preliminary programming information. All communication shall be through this person. 590 0 obj <>stream RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS 301 and Section 16010 of these Specifications. SUMMARY This Section includes general administrative and procedural requirements, as well as the following basic electrical materials and methods: Referenced organizations and codes Site visit Outages Installers qualifications Work performance Submittals Quality assurance Delivery storage and handling Sequencing and scheduling Variances Guarantee/warranty Listed manufacturers Approved equal equipment layouts Fire stops & smoke seals for wall & floor sleeve applications Coordination drawings Construction record documents Operation and Maintenance manuals electronic files Concrete housekeeping pads Grout Roughins Electrical installations. 0000002122 00000 n Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. <> NESC (National Electrical Safety Code). Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. Use operation and maintenance manuals and video as basis of instruction. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. PDF Section 16010 Electrical General Provisions Part 1 - General 1.1 PDF Section 16010 Basic Electrical Requirements Part 1 - Ieua PDF Abu Dhabi Sewerage Services Company (Adssc) General Specification for 2013 0 obj <>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream Tools. %%EOF Diagrams shall indicate cable on raceway between points. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel].